Paradeep Refinery Flu Gas Ducting Work 4 Mtr Dia x up to 40 mm Thk with 150mm Refracory lining assistance work at our facilities developed at Bobbili Growth Centre,Vizag,A.P.
2 x 222 MW Konaseema Power Plant – Total Mechanical works of HRSG Units 1&2.
Includes Fabrication&Erection of Structures,Modules,Bypass stack,Boiler Drums,Main Stack ,Piping IBR& Non IBR(P11,P22,P91).